CASE STUDY - Mixing System Alterations (value $30,000)

SITUATION

Large Stockfeed mill in Toowoomba

TASK

Mixer alterations to improve production of Stockfeed

ACTIONS

  1. Obtain customers initial requirements
  2. This included manufacture and installation of fabricated products including bins and access platforms and handrails
  3. Detail the customer’s requirements as well as a manufacturing procedure and installation procedure.
  4. From the procedure it can be determined the practicality of the project
  5. Once the practicality has been sorted a timeline is produced
  6. The customer was consulted and any problems determined and solved
  7. A quote is prepared and submitted
  8. Manufacture drawings prepared
  9. Parts manufactured
  10. Installation
  11. This project required organisation between the customer, electrical people, crane hire people (100 tonne crane required for this job).

RESULT

  • ✓  Within customers budget
  • ✓  We were able to offer alternatives to meet the budget and there the project go ahead
  • ✓  The mixing is much more efficient now
  • ✓  Area is more safe